Set up a maintenance plan

A reliable plan begins with the correct component and the current manufacturer publication.

  1. 1

    Check the manufacturer interval

    Confirm model, build year, operating profile and manual edition. Generic guidance is not a substitute.

  2. 2

    Choose the interval type

    Use calendar, counter or both. For combined requirements, the first threshold reached applies.

  3. 3

    Set enough lead time

    Allow time for parts, yard access or a qualified workshop.

  4. 4

    Complete with evidence

    Record date, reading, work, parts, cost and evidence. The completion remains historical.